The aluminum-coated balloon is on Saturday at the station Karlsplatz to the overhead line and caused a short circuit.
Again, an aluminum-coated balloon for failures and delays in the S-Bahn in Munich. The balloon was at the station Karlsplatz to the upper management and have triggered a short circuit, said the Federal police on Sunday. S-cars were early Saturday morning on the so-called stem around 70 minutes, not track driving.
again and again, aluminium balloons, cause short circuits in the electricity network of the S-Bahn. In November 2018, such a balloon had been thrown on the top line, an arc with a loud Bang and smoke, a tram driver was injured, tens of thousands of passengers were affected by cancellations and delays. The Federal police made it clear that the children for the most popular balloons in the railway stations of the Deutsche Bahn are prohibited.
The balloon was not on Saturday but the only Problem with the Munich S-Bahn: Because a woman had gone into a railway tunnel, had to stop the Federal police all the trains. Daily 000 people use around 840 on the S-Bahn in Munich. The more than two-thirds of the passengers in the rail transport in Bavaria. Regularly there are failures and delays on the so-called trunk line. The reason is that In the area of the city centre, the S run timed-tracks dense and usually on two tracks. A train remains, for example, jamming the trains behind it.