SPD politicians from the Maxvorstadt have the support of the U-Bahn in the eye – and see the need for action. You are demanding to improve the appearance in a sustainable way. Especially the holding affected the University, Odeon Platz, the königsplatz, Theresienstraße, Joseph court, Stiglmaierplatz and Maillingerstraße. the Stefan Mühleisen
The social Democrats in the district of Maxvorstadt, the metro stations have taken in your area of effect in the eye – and what you have seen, you don’t like them at all. It is not sufficient to preserve the stations in “only half-heartedly, before the decline”, write the city district politicians, in an application to the Munich transport company (MVG), the district Committee has now decided. The body calls on in the paper, the städtische subsidiary to renovate the appearance of the underground railway stations in the short to medium term, and to upgrade. Explicitly, the holding points of the University, Odeonsplatz, Königsplatz, Theresienstraße, Joseph court, Stiglmaierplatz and Maillingerstraße.
The SPD parliamentary group has compiled a catalogue of claims, documented with photos, which should be resolved according to the representatives of the people. At the station “Theresienstraße” square and the Odeon gape, as well as on the building under the king’s square, for example, large gaps in the wall panels to the rails so that the bare concrete and the stop watch seemed to be; this also applies to the missing slats in the ceiling designs, the tubes give a free view of the blank lines located and, in part, inactive neon.
stripped to the concrete of the underground station “theresienstraße”. (photo: Robert Haas)
In the open Ceiling structures have taken root and sometimes pigeons, complain about the local politicians. The result: plenty of pigeon droppings at the edge of the platform, for example, on the Stop “Theresienstraße”, as well as heavily soiled Ceiling elements. Furthermore, the politicians have noticed the arg tapped staircase handrails. “So is denatured to the citizens of the switch from the car to the U-Bahn”, says the SPD parliamentary group spokeswoman in the district Committee, Catherine Blepp, and adds that “such neglect is unacceptable”.
Such harsh words don’t want to accept the speaker of the MVG, Matthias Korte, in turn. “We are very pleased that the district Committee is located on the appearance of the metro stations,” he says. “But it’s not true that we give the stations to the expiration price, the above-mentioned things to be documented, rather, that we take care of the issue.” The Odeonsplatz is specifically for the MVG on the Plan: A General renovation was planned, says spokesman Korte, the schedule is still open, but to a concept.
The decades-old Munich U-Bahn network came stations with its 100 rail anyway, in the years to come. Some of the dilapidated buildings has renovated the MVG already: The main train station and Marienplatz newly designed sub-projectiles; at the Ostbahnhof by salt water entrained concrete were replaced joints. The largest project is the refurbishment of the underground station Sendlinger Tor. “We have our hands full with the renovation, because the embellishment has to be back, unfortunately,” says Korte. On the BA demanded, unsightly gaps in the wall and ceiling panels related, it means The parts are, therefore, way, because either the concrete and steel be set, or parts of the holding device repair. “This may well take months,” says Korte, especially when the post in question in the track area. “We have only a short window of time in the night hours, when the trains run.”
A large part of the ceiling slats on the railway have stations here, anyway “to the end of their life time,” as Korte says. The MVG-planning Department, according to his words currently in the process of developing a network-wide concept for the ceiling panels to the U-Bahn stations. Escort advertises this understanding of the sometimes unsightly sight. “It is the duty with the construction of
Also in the ceiling construction parts. (photo: Robert Haas)
with regard to the lighting systems, are to disappear, the old neon tubes in the medium term, across the Board. A first attempt with LED lamps on the Stiglmaierplatz have led to frequent outages; currently a pilot project in the course, however, at the train station Machtlfingerstraße quite promising, with assigned escort.
Meanwhile, the passengers in addition to the aesthetic Nuisance the next few years, probably to annoying impairments. Because it’s not just the equipment, also the rails in the tube structure must be renewed, as this is done, for example, on the route of the U 3 between scheidplatz and Münchner Freiheit. Everything had seemed out of it,, Sleepers, cable. You’ll put the Work in either the late traffic and the bars to extend or even single Branches to block says MVG-speaker Matthias Korte.